Estimate a whole-house or multi-room remodel from the area you are changing, with demolition, permits and contingency.
Quick answer: A 500 sq ft remodel at a typical $130 per square foot comes to about $65,000 for the main work. Demolition and permits add roughly $1,500, and a 15% contingency lifts the planning figure to about $76,500. Edit the unit price and scope to match your rooms.
sq ft
$/sq
Typical U.S. range: $70–$250 per sq ft
$
$
%
Estimated total
$76,475
500 sq ft at $130
Cost per sq
$153
Total divided by quantity
Cost breakdown
Materials (55% of base)$35,750
Labour (45% of base)$29,250
Removal & disposal$800
Permits & fees$700
Contingency (15%)$9,975
Estimated total$76,475
Plausible planning band: $61,525 to $95,162 — roughly ±20% around your unit price, before any regional or seasonal swing.
This is a planning estimate built from the unit price you enter. Real quotes depend on your region, season, site access and the contractor — get at least three.
Core facts
Typical U.S. range
$70–$250 per sq ft
Area basis
Only the space you are changing
Cost split
About 45% labor, 55% materials
Watch for
Structural, mechanical and code upgrades
What is Home Remodel Cost Calculator?
Whole-house and multi-room remodels are hard to price because they mix trades, rooms and finish levels. The practical approach, and the one this calculator uses, is to price the area you are actually changing: a single bathroom, a kitchen plus adjoining rooms, or most of the house. Multiply that area by an installed price per square foot, then add demolition, permits and a contingency. Cosmetic work that keeps plumbing and walls sits at the low end of the range, while opening walls, replacing systems or moving the kitchen sits far higher. Treat the result as a budget for planning and a way to compare bids.
Common uses for Home Remodel Cost Calculator
Budget a whole-house remodel before hiring a designer or contractor
Price only the rooms you are changing instead of the entire house
Compare a cosmetic refresh with a down-to-the-studs renovation
Set a realistic ceiling that includes permits and contingency
Scope beats size
A 400 sq ft refresh and a 400 sq ft gut renovation are different projects wearing the same measurement. Refreshing means paint, flooring, fixtures and maybe new trim. A gut renovation replaces the walls, wiring, plumbing and often the layout. Because the second version multiplies both labor and material, the scope selection in this calculator changes the total far more than the area does.
Why a single blended rate is still useful
Most homeowners do not know the framing, drywall, electrical and trim costs of every room, and a blended rate is a fair way to get a first number. It is honest about being an average: high-cost rooms such as kitchens and bathrooms pull it up, bedrooms and hallways pull it down. If your project is mostly one type of room, price that room with its own calculator instead.
Living through a remodel
Cost is only part of the decision. A remodel that removes a kitchen or a bathroom changes daily life for months, and some families pay for temporary arrangements that never appear on a contractor invoice. If your plan touches the only bathroom in the house, or the kitchen, build the timing and the staging into your thinking before you sign anything.
Frequently Asked Questions
How do I estimate a remodel if I only know the room sizes?
Add up the floor area of every room you are changing and enter the total. Rooms you leave untouched stay out of the number. Then pick the scope that matches your ambition, because scope matters more than size: the same 500 square feet can be a paint-and-floor refresh or a full gut.
What is a reasonable cost per square foot for a remodel?
Typical figures run from roughly $70 per square foot for light cosmetic work to $250 or more when walls, plumbing or systems are replaced. The spread is wide on purpose: two projects of identical size can differ by three times if one keeps the layout and the other rebuilds it.
Should the estimate include permits and design fees?
It includes a permit allowance you can edit, but not architect or designer fees, which are usually billed separately and often as a percentage of construction cost. Structural, electrical and plumbing work almost always needs a permit, so keep that line in the budget even when you are unsure.
How much contingency should I hold for a remodel?
Fifteen percent is a common planning allowance, and twenty percent is sensible for older homes or any project that opens walls. Contingency is not waste: it is the money that covers rot, outdated wiring, uneven floors and the change orders that appear once demolition starts.